An HDPE pond liner can lift at a corner when water or gas collects beneath an unsupported fold, when wind catches an exposed edge, or when the corner anchorage loosens. An exposed fold that rises in the sun may be a thermal wrinkle rather than a floating liner. If the bulge appears after rain or gets bigger as the pond level falls, check for water beneath the liner first. A falling pond level reduces downward water pressure; it does not create upward pressure.
Why the corner can lift while the rest stays flat
Where two slopes meet, a fold or seam detail can leave the liner spanning a depression instead of resting on the prepared ground. An underliner drain or vent farther along the bank may not connect to that pocket. At the rim, movement along either adjoining edge can show up at the same corner. A raised corner with an edge that has moved inward calls for a different check than a dome below an edge that is still in place.
After heavy rain, rising groundwater can increase pressure beneath the liner. The U.S. EPA provides background on groundwater [1]. Runoff entering at the perimeter or pond water reaching the underside through a defect are other possibilities. Wet ground outside the pond is a clue, not proof of how water got under the sheet.
An air pocket can remain after installation. Gas can also form if organic material decomposes without oxygen beneath the liner; sediment on top of the liner does not show what is happening underneath. The U.S. EPA describes anaerobic gas formation in landfills, but that does not establish the source or composition of gas in a pond [2].
How to narrow down the cause without touching the liner
Compare the shape of the raised area, the position of the edge, and when the movement occurs. Watch from stable ground away from the lifted area. Do not press the bulge or lean in to smell it: odour is not a reliable warning of hazardous gas exposure, including hydrogen sulfide [3].
| What you see | What to investigate first | What to record or check safely |
|---|---|---|
| A broad dome appears after rain or grows during drawdown. | Water pressure beneath the liner | Rainfall, pond level, visible seepage outside the bank, and discharge at any safely visible drain outlet. |
| A rounded pocket appears during first filling. | Trapped air or water beneath the liner | When it first appeared, whether it persists, and any underliner drain or vent shown on the installation drawings. |
| A narrow fold on an exposed slope rises in direct sun and relaxes in shade. | Thermal wrinkling | Which part was in sun, and whether the same fold changes with no change in pond level or edge position. |
| An exposed corner flaps during gusts and settles when the wind drops. | Wind acting on a loose or exposed edge | Where the flapping starts and whether anchor cover is visibly missing or eroded. |
| The edge has pulled inward or the ground along the anchor trench has settled. | Loss of anchorage, possibly alongside uplift | Edge position against a fixed feature in earlier photos and any visible washout or settlement. |
Example: Say the northwest corner is flat before a storm and domes the next day, even though the liner edge still lines up with the same fence post. Compare dated photos from that same safe viewpoint with the pond-level and rainfall records. If the dome grows as the water level falls, ask the installer to check for water pressure beneath the liner and whether the drain serves that corner. The sequence helps the installer decide what to check first; it does not prove the cause.
What a flowing or dry drain outlet actually tells you
A flowing outlet tells you water is reaching that outlet, not where it came from or which part of the liner it drains. A dry outlet might mean no water is reaching it, or that the raised area is not connected to it. If you can see the outlet from stable ground, note whether flow starts after rain, whether it continues as the pond level falls, and whether anyone knows which drain serves that outlet. Give those notes and any drainage drawings to the installer. Do not open a drain, clear a blockage or operate a pump to test the theory.
If the pond is losing water as well: Keep two observations separate: when the pond level drops, and when the bulge changes. A lower level can expose an existing uplift problem; a liner defect can also feed pond water beneath the sheet. Look at existing level records alongside rainfall, top-ups and known withdrawals before treating the drop as evidence of a leak. For example, if the level keeps falling after a scheduled withdrawal ends and the corner stays raised, report both facts. Ask the installer to check for a leak as well as pressure beneath the liner, rather than assuming that either explains both symptoms.
What the water levels can tell you
Compare the water levels on both sides against the same point on the sheet. In a still-freshwater example, groundwater connected to the underside and standing 0.50 m above that point produces about 4.9 kPa of upward pressure. If the pond surface is 0.30 m above the same point, it supplies about 2.9 kPa downward. The difference is about 2.0 kPa upward before allowing for liner weight and other restraint (p = ρgh, using 1,000 kg/m³ and 9.81 m/s²).
For comparison, a 1.0 mm sheet at a formulated density of 0.940 g/cm³ has a mass of about 0.94 kg/m²; a 1.5 mm sheet has a mass of about 1.41 kg/m². The latter’s weight spread over a horizontal square metre is only about 0.014 kPa. These figures use the GRI-GM13 minimum average density as an example, not a measured roll density. The comparison is not an uplift design check or a safe drawdown limit [4].
The pond gauge gives you only one side of the comparison. It cannot tell you the water pressure beneath the liner, and the height of the bulge is not a substitute for that reading. If the installer has no usable groundwater or underliner records, give them the timeline you do have and let the designer decide whether a site measurement is needed before changing the operating level.
What to do now
- Keep people, livestock and equipment away from the raised area. Do not walk on, cut, puncture or weigh down the bulge.
- Do not drain or refill the pond just to see what happens. Ask the operator or designer how to manage the level. If there are signs of bank instability, an uncontrolled release or a suspected hazardous gas release, move away and follow the site’s emergency procedures.
- Arrange a prompt inspection if the bulge persists, grows, affects more than one corner, or shows up alongside edge pullout, seam damage or unexplained water loss. A corner settling again does not rule out a recurring problem.
- Send the installer dated photos from the same viewpoint, rainfall and pond-level records, and any liner, seam, drain or anchor drawings you have. Include the pond dimensions, what it contains, and the liner type and nominal thickness if known.
What a lasting repair addresses
- Water or gas beneath the sheet: A qualified designer checks the source and whether the pocket connects to a working drain or vent. Depending on the findings, the repair may involve restoring drainage, adding a designed outlet, or repairing a leak that feeds the underside. The design needs to prevent backflow and provide a safe discharge or vent location. The site’s hydraulic lining applications give context for this type of work.
- Wind or anchor movement: Check the two adjoining edges, the trench and the supporting soil before reinstating the restraint. A thicker sheet or extra weight does not restore a failed anchor or remove pressure beneath the liner. Any temporary restraint should be specified for the site, not improvised over a suspended fold.
- Thermal folds or unsupported liner: Review the corner geometry, panel layout and subgrade support. The guide to thermal wrinkles and geomembrane bulges explains why folds and voids need different fixes. A PET nonwoven protection layer can cushion the liner where specified, but it does not replace grading, firm support or designed drainage.
Have qualified personnel carry out any investigation that requires access to the liner and perform repairs under local requirements and the project specifications. Test repaired seams against the project quality plan before returning the pond to service.
What material specifications can and cannot tell you
GRI-GM13 covers smooth and textured HDPE geomembranes from 0.75 to 3.0 mm. For 1.0 and 1.5 mm smooth sheet, respectively, it specifies minimum average tensile yield strengths of 15 and 22 kN/m (ASTM D6693 Type IV) and minimum average index puncture resistances of 320 and 480 N (ASTM D4833). These manufacturing quality-control results are not allowable loads for an installed corner. The specification also lists 2.0–3.0% carbon black (ASTM D4218) and at least 50% average high-pressure oxidative induction time retained (ASTM D5885) after 1,600 hours of laboratory UV conditioning (ASTM D7238). This does not predict field service life [4].
If a slope detail is being redesigned, compare the HDPE geomembrane options with the designer. For textured HDPE, the GM13 minimum average asperity height of 0.40 mm (ASTM D7466) is not an interface shear value. GM13 calls for direct shear testing of the relevant materials (ASTM D5321 or D6243, as prescribed) unless the design engineer formally waives it with the owner’s agreement before installation [4].
If the designer is considering LLDPE geomembrane for irregular geometry, GM17 lists a minimum average elongation at break of 800% for smooth LLDPE in the ASTM D6693 Type IV laboratory test [5]. The corresponding GM13 figure for smooth HDPE is 700% [4]. Neither figure is a permissible installed strain or a reason by itself to swap out a lifting panel.
For a lined fish or shrimp pond, coordinate any proposed drawdown, inspection or return to service with the farm operator as well as the liner professional.
How to check the repair and reduce the chance of another lift
Ask the installer to show what changed, not just whether the liner looks flat. The USDA Natural Resources Conservation Service’s pond-lining standard treats groundwater conditions, subgrade, drainage and venting, anchorage, seam quality control, and operating levels as separate design or maintenance checks. Use those as questions for your installer, not as a substitute for local requirements or site-specific design [6].
- If drainage or venting was changed: Ask which part of the liner the revised system serves, where it discharges or vents, and what the operator should record at the next natural rain or planned drawdown. Keep an updated drawing or marked-up sketch so a future flowing outlet can be matched to the correct drain.
- If a seam or penetration was repaired: Ask for the repair location, the checks required by the project quality plan, and the recorded results. If the plan calls for laboratory strength tests on thermally welded, nonreinforced HDPE or LLDPE seams, GRI-GM19a addresses shear and peel properties using ASTM D6392. Those results do not, by themselves, establish that the entire pond is leak-free [7].
- Before normal operation resumes: Ask who authorises the refill or return to service, what operating levels apply, and what observation should trigger another inspection. During the next normal rain or planned level change, compare safe-viewpoint photos with the repair record. A flat panel immediately after a repair, particularly at a different water level, is not enough on its own to show that the original problem is gone.